MY BOARDSERVER
 Subject: 5 Group Perfomance Report
 
Author: Dale
Date:   2/12/2012 7:29 am 
DD02112D- 5 Group Performance

Saturday, February 11, 2012
8:38 PM

Dale site work deighta to secure site better and to add feature to download files, pictures, and web links to study or research parts.

The Roy/Dale VPPF theory is in progress, board pictures will be released as soon as possible and perhaps by Monday 14th afternoon security web issues will be resolved (encrypted).

We have the design drawings of our Heat Exchanger (HE) which has eight Heat Generator (HG) pins, 16 thermocouples, one 3/4" Cooling Tube (CT) bore, eight hydrogen fill/vent tees with adjustable reliefs for venting each pressurized HE chambers. There are eight Inner Heaters (IH), a Distribution Block (DB) hydrogen 8 pressure ports to each HE chamber tee.

The HG are the fuel rods but we want to stay away from any old definitions and parallels with the nomenclature of Hot Fusion or Nuclear Fission.

A miniature electrolyzer block produces hydrogen and pressurizes the HE chambers, water decomposition continues under extreme pressures. A Venting Chamber connected to all eight tee Pressure Valves (PV) and CT is press fitted into the HE CT bore.

We are ready to contact the machinist but first we need Randy to make out an NDA for the specific purpose of manufacturing parts for us and to have the machine shop owner sign it. We need to finalize the LEarNeR Kit © -01 component list along with discussing how the even team is doing (2&4) Lui and Randy, we have mostly kept up and doing things needed on our end the odd team (1-3&5) Roy, Joshua and Dale.

Please update us as you make progress even team, on the board server and the blog. There are many issues and I plan to have it all resolved by Monday morning.

Looking forward to the kit progress did you see the millions given to the Missouri school for LENR research, after we get going on the paperwork and more correspondence is documented we have the potential to get large bank as a team. I am going to have to design this kit myself so I am on that track now and writing the paperwork.
Reply To This Message

 Topics Author  Date      
 5 Group Perfomance Report    
Dale 2/12/2012 7:29 am 
 RE: 5 Group Perfomance Report   new  
Lui 2/13/2012 12:32 am 
 RE: 5 Group Perfomance Report   new  
Dale 2/14/2012 3:41 am 
 Reply To This Message
 Your Name:  
 Your Email:  
 Subject:  
  Submission Validation Question: What is 31 + 57? *  
* indicates required field